With topical presentations, panel discussions, Q&A sessions and innovator’s showcase the day is set to be both informative and engaging.
The awards were presented by Mary Bond, Group Director, Seatrade Cruise, alongside Ingo Soerensen, Area VP, Global Cruise Sales, Oracle Hospitality and Ian Richardson – CEO & Co-founder, TheICEWay - Principal Sponsors of the Seatrade Cruise Awards.
TMC will supply a major marine compressed air system consisting of 4 x working air compressors, 4 x desiccant air dryers, 2 x instrument air compressors and desiccant air dryers, 4 x starting air compressors, 4 x high pressure compressors for the vessel’s tensioning system, plus 4 x high pressure air dryers.
Under the contract, TMC will provide a large compressed air system consisting of frequency-controlled instrument air compressors, air compressors, and associated air dryers and filters.
The investment enables Norsepower to scale up production at its manufacturing facilities as part of a next phase of commercialisation triggered by demand for its renewable wind energy propulsion systems.
From shipbuilding raw components, electrical systems, deck and safety equipment, port constructions to shipbuilding systems and technology, all maritime related products and services can be found in Marintec China.
This effort is in line with the country’s goal to reduce litter, which can be dangerous to marine life since garbage and other plastic materials may be mistaken for food.
Chelsea Technologies, a world leader in the design and manufacture of sensors for the maritime sector, and a Sonardyne company, has announced that its Sea Sentry wash water monitoring system for ship exhaust gas cleaning systems has been awarded type approval by DNV-GL.
These build on contracts secured earlier this year to supply 18 hatch cover sets for the same series of containerships, bringing to 26 the total number of shipsets ordered by HMD from MacGregor during 2018.
Until now, there was no requirement to prove that treated waters were compliant with the rules. Only a ballast water treatment plant’s electrical and automation systems and physical parameters were checked during the commissioning process.






















